Step 01
One machine
The tested setup stays on the machine it was proven on, with the settings recorded and the sample left in production.
For knitting mills
Yarn breaks, tension that drifts and a speed the machine will not hold are measurable problems. We start from the figures your shift already records, install a sample on one of your machines, and compare the result with that baseline before anything is scaled.
On the mill floor
Feeding problems rarely arrive as one failure: several values move the wrong way at once — and they are the values your production record already holds.
Trial installation
A sample is installed on one machine, in a window agreed with your production plan, and tuned with the machine running your product. The settings are recorded as they are confirmed.
Trial process
A trial runs on one machine, inside your normal production, against figures taken before the change. Six steps — and the last one can just as well be a decision not to continue.
Machine type, brand and model, the yarn you run, the product, and the values you already record.
We check whether electronic feeding fits the problem. Where a mechanical change solves it, we say so.
A sample is installed on one machine, in a window agreed with your production plan.
Settings are tuned with the machine running your product, and recorded as they are confirmed.
The same values are measured again, the same way, and put beside the numbers taken before.
Keep the configuration, adjust it, or stop. The decision follows the comparison, not the schedule.
Baseline data
Before a sample is fitted we ask for what the machine is doing now. Without those figures there is nothing to compare against, and a trial becomes an opinion.
Validation
A result only counts if it is measured the same way as the baseline: same machine, same yarn, same product, same shift.
No percentage, speed figure or response time is stated on this page. The numbers that matter are the ones measured on your machine — and a trial can also end with the conclusion that the change is not worth keeping.
Installation
Installation is short work, but it decides whether the trial means anything: planned with your production team, and everything set is written down.
From trial to volume
The step after a trial is a commercial decision, and it is taken on the comparison — not on a delivery schedule. Each stage below starts from the configuration confirmed on the machine.
Step 01
The tested setup stays on the machine it was proven on, with the settings recorded and the sample left in production.
Step 02
Further machines follow when they run the same yarn and product under the same conditions, so the confirmed settings carry over.
Step 03
The validated specification becomes the supply position: repeat orders, spare feeders and wear parts on the same specification.
A rollout, and any project registration or conditional area arrangement that goes with it, is agreed case by case and confirmed in writing. Nothing on this page is an exclusive or territorial commitment.
Engineering support
Support is not a separate department — the engineers who checked the application and set the sample are the ones who answer.
How a component is checked before it ships
Quality and TestingThe two tracks behind every order
Our ProcessNext step
Send the machine model, the yarn, the product and the figures you already record. An engineer will come back with the configuration to test and what the comparison would look like.